De-Risking Your Facility’s Electrification
Process & Timeline
Full EPCM Capabilities
Single-source accountability from concept to completion. We manage design, incentives & tax credits, vendor selection, construction oversight, and startup to streamline execution and mitigate risk.
Technical Expertise
Our engineers are experienced in heat pump & waste heat recovery technology, thermal energy storage systems, and thermal energy modeling to optimize every system design.
Step 1: PRELIMINARY SYSTEM DESIGN & ANALYSIS ~ 1 month
-
Analyze to understand current natural gas/LP and electricity usages, costs, and seasonality
-
Detailed cataloguing of facility’s existing equipment and operations to create a baseline model
Inspection of current electrical panels and service points
Documenting of interior & exterior space for potential HPWH equipment
Identify potential energy efficiency measures for hot water system & operations
-
All modeling performed with Polysun Designer from Vela Solaris:
Baseline system
Option #1 – Air-source HPWHs
Option #2 – Water-source HPWHs, with Waste Heat Recovery (WHR) and Combined Heating & Cooling (CHC), if facility has refrigeration
Option #3 – Water-source HPWHs, with WHR, CHC, and Solar Thermal/PV
-
Highlight energy & cost savings of each option, along with ROIs
Discuss equipment options and performance
Detail potential Utility Incentives & Financing, and Tax Credits
Step 2: ENGINEERING ~ 2 - 3 months
Finalize design & equipment in Polysun
Apply for Utility Incentives & 0% On-Bill Financing
Initiate Utility service upgrades, if necessary
Verify Tax Credit eligibility for project & maximize credits
Mechanical Electrical Plumbing (MEP) layouts & design documentation
Civil Engineering (CE) layouts & design documentation
Submit Permits to local authority
Title 24 verification & documentation
Step 3: PROCUREMENT & SUPPLY ~ 2 - 3 months
Vendor qualification & bid management
HPWH & Thermal Energy Storage Tank(s) sourcing
Auxiliary equipment sourcing
Equipment logistics & delivery coordination
Step 4: CONSTRUCTION MANAGEMENT ~ 2 - 3 months
Secure & verify final permits
Site prep & civil engineering coordination
Installation supervision & QC
Commissioning & startup support
Close out Utility Incentives & Tax Credits documentation
Operator training & documentation